Multicolor Alkyd Ship Deck Paint Spray Paint 75 Microns Wet Topcoat Type

Detailed Product Description Product Description • A quick drying single pack alkyd deck paint • VOC is 450 g/L Intended Uses • A cosmetic finish • For use in steel bridge of water areas • For use in steel frame of road and bridge Product Information • Volume Solids 46%±3% • Finish/Sheen...

Product details

Detailed Product Description

Main Raw Material:PolyurethaneStandard Film Thickness:40 Microns Dry ( 75 Microns Wet)
Application Method:SprayColor:Multicolor
Type:TopcoatLuster:Half Glazed
Theoretical Spreading Rate:200Solids (vol %):≤390g/L


Product Description
• A quick drying single pack alkyd deck paint
• VOC is 450 g/L

Intended Uses
• A cosmetic finish
• For use in steel bridge of water areas
• For use in steel frame of road and bridge

Product Information
• Volume Solids 46%±3%
• Finish/Sheen Seim-Gloss
• Typical Film Thickness 40 microns dry ( 100 microns wet)
• Theoretical Coverage: 11.5㎡/L at typical film thickness
• Mix Ratio: one pack
• Method of Application
   Airless Spray Tip size range   0.38-0.53mm
   Output Pressure  ≥17MPa
   Air Spray Tip size range   2-3mm
   Output Pressure  ≥0.4MPa
   Brush/Roller Need to coat several times to get film thickness
• Thinner: Not recommended. Use water only in exceptional circumstances(max 5% by volume)
• Drying Information
   -5°C   5°C   25°C  35°C
   Touch Dry  2H    1H    30min  15min
   Hard Dry  24H   20H    12H   8H
   Pot Life  Not applicable
   Overcoatings Data: Substrate Temperature
   Overcoated By
   -5°C   5°C   25°C  35°C
   Min Max  Min Max  Min Max  Min Max
   48H no   36H no  24H no   24H no
• Storage: Store in cool and dry conditions, Well ventilate. Keep away from hot and fire.Store temperature should be higher than 0°C.
   Shelf Life: 12Months minimum at 25°C.Subject to re-inspection thereafter.
• Pack Size: 22kg/18L in 20L container
• Surface Preparation: The surface should be cleaned oil or grease, dust, and other foreign matter to keep clean and dry.

Surface Preparation:
1. High pressure fresh water wash or fresh water wash, as appropriate, and remove all oil or grease, soluble contaminants and other foreign matter in accordance with SSPC-SP1 solvent cleaning. All surfaces to be coated should be clean, dry and free from contamination.
2. Newbuilding/Major Refurbishment
725C42-1 should be applied over a recommended primer coating scheme. The primer surface should be clean, dry and free from contamination. 725C42-1 must be applied within the coating interval specified (consult the relevant and free from contamination. 725C42-1 must be applied within the coating interval specified (consult the relevant product data sheet). Areas of breakdown, damage etc. Should be prepared to the specified standard (eg.St3) and primed prior to the application of 725C42-1
3. Repair/On Board Maintenance
725C42-1 should be applied over a recommended primer coating scheme. The primer surface should be clean, dry and free from contamination. 725C42-1must be applied within the coating interval specified (consult the relevant and free from contamination . 725C42-1 must be applied within the coating interval specified(consult the relevant product data sheet). Areas of breakdown, damage etc. Should be prepared to the specified standard (eg.St3) and primed prior to the application of 725C42-1
725C42-1 Maybe applied directly over aged 725C42-1 following thorough fresh water washing and degreasing provided the coating to be overcoated is in intact and tightly adherent condition. Loose or flaking coatings should be removed back to a firm edge and an appropriate primer should be used to repair the area before application of the full coat.

Limitations
• Apply in good weather, Temperature of the surface to be coated must be least 3°C above the dew point when the humidity is lower than 85%
• The dry time and over coating interval may change according to the environment factors.
• Forbid to trample or pullute the surface of AF3-1 and coat the next paint before the film is hard dry.

29-1.jpg


Related Products
Feedback

Our Service

The company has been developed a series of ship coating products have been passed approval by CCS, LR, and DNV. The coatings systems hold independent intellectual property rights meet the requirements of corrosion on steel and concrete structures in harbors, wharfs, bridges, power stations, petrol-chemicals and civil engineering.

Feedback

Contact Us

Address:Room 214 2F No.149-2 Huangpu AVE Middle, TianHe District, Guangzhou City, China

Tel: 86-20-38993165

Fax: 86-20-38993165

E-mail: sales@huisinschem.com

CopyRight© Huisins New Material Technology Co.,Limited

Huisins New Material Technology Co.,Limited